How to Plan a Roof Replacement Around Your Solar Panels
If your Canberra home has solar panels and the roof beneath them is nearing the end of its life, you face a practical question: how do you replace the roof without damaging your solar investment, losing generation, or paying for the same work twice? The answer is careful sequencing, good communication between trades, and a clear understanding of how Canberra's climate, regulations and energy market affect your decisions. This guide walks through the process from first inspection to final reconnection.
Why Roof and Solar Timing Matters
Solar panels are typically designed to last 25 years or more, while roofing materials vary widely. Older concrete tile roofs can outlast panels, but corrugated steel roofs with failing fasteners, deteriorating sarking, or cracked terracotta tiles may need attention well before the solar system is due for retirement. Many Canberra homes fitted with solar during the rebate-driven boom of the 2010s are now at the point where both the roof and the early-generation system deserve a hard look.
Panels cannot simply stay in place while a roof is replaced. They must be disconnected, removed, stored safely and reinstalled once the new roof is complete. Handled poorly, this can lead to cracked panels, damaged wiring, voided warranties or roof penetrations that leak. Handled well, it is a straightforward project that can be an ideal opportunity to upgrade your system.
Step One: Assess the Age and Condition of Both Systems
Before any quotes are requested, gather the facts about what you have on the roof.
Check Your Roof
Look for signs that replacement is genuinely needed rather than a repair. Common indicators include:
- Cracked, slipped or porous concrete or terracotta tiles
- Rust, lifting sheets or loose fixings on metal roofing
- Sagging battens or visible daylight in the roof space
- Recurring leaks, particularly around solar mounting points
- Deteriorated sarking, insulation damage or condensation in the ceiling cavity
- Roofing material that is 25 to 30 years old or more
A licensed roofer can inspect both the surface and the roof space, and can tell you whether targeted repairs would buy you meaningful time or whether full replacement is the better investment.
Check Your Solar System
Locate your installation paperwork, including the panel brand and model, inverter type, installation date, warranty documents and the installer's details. Note the inverter age in particular. String inverters commonly last 10 to 15 years, so a system installed before about 2016 may be on its original inverter, which could fail soon after being disturbed. If your panels are of an older, lower-output generation, the roof replacement may also be the right moment to compare the cost of reinstalling them against upgrading to higher-efficiency modern panels.
Step Two: Decide Whether to Reinstall, Upgrade or Expand
Because the array has to come off anyway, the labour for removal and mounting is already being paid for. That changes the economics of an upgrade. Consider these options:
- Reinstall existing panels: Suitable when panels are in good condition, still performing close to their rated output and have years of warranty remaining.
- Replace the inverter during the project: Sensible if the inverter is more than eight to ten years old, since you avoid a separate future visit.
- Upgrade to newer panels: Modern panels produce more power per square metre, which can be valuable on smaller or shaded roof sections.
- Add a battery or make the system battery-ready: With household battery uptake growing strongly across Australia, including under the Federal Government's Cheaper Home Batteries Program introduced in 2025, it is worth asking your solar installer about integrating storage while the system is already being reworked.
Check current federal and ACT incentives before committing. The ACT's Sustainable Household Scheme has historically offered zero-interest loans for eligible home energy upgrades, and program details change from time to time, so confirm what is available in 2026 and whether any application must be approved before work begins.
Step Three: Choose Your Roofing Material With Solar in Mind
The roofing material affects how panels are mounted, how many penetrations are required and how easily the system can be serviced in future.
Colorbond and Metal Roofing
Metal roofs are popular in Canberra and work well with solar. Panels can often be attached using clamps that grip the roof ribs without drilling through the sheet, which reduces leak risk. Metal also performs well in frost, hail and bushfire-prone conditions. Lighter colours help reduce heat load in summer, which can also support better panel efficiency.
Concrete and Terracotta Tiles
Tile roofs need mounting brackets or hooks that sit beneath or between tiles. When replacing tiles, your roofer and solar installer should agree in advance on where the brackets will go and how tiles will be cut or notched for a neat, watertight fit. If the existing tiles are sound but the underlay and battens are failing, re-roofing with the same tiles can be a cost-effective path.
Consider Roof Pitch and Orientation
Canberra's latitude means north-facing roof planes at a moderate pitch generate the most annual output. If the new roof design changes pitch, adds a dormer or alters sections of roofline, discuss with your solar installer how that could affect panel layout and shading.
Step Four: Understand Canberra Conditions and Regulations
Canberra's climate is demanding on roofs. Cold winters, frost, hot dry summers, strong winds and occasional severe hailstorms all place stress on roofing and mounting hardware. Fixings should be rated for local wind conditions, and flashing details should be carefully executed around every penetration.

Regulatory and safety points to confirm include:

- Licensing: Roofing work and electrical work must be carried out by appropriately licensed tradespeople in the ACT. Solar disconnection and reconnection must be performed by a licensed electrician, ideally one accredited by the Clean Energy Council.
- Building approval: Most like-for-like roof replacements are straightforward, but changes to roof structure, pitch or form may require approval. Confirm requirements with your builder or certifier, and check any additional rules if your property is in a heritage precinct or subject to a Crown lease condition.
- Asbestos: Homes built before the mid-1980s may contain asbestos in roofing sheets, eaves or flashing. Testing and licensed removal are required if asbestos is present, and this must be settled before solar panels are lifted and work starts.
- Insurance and warranties: Notify your insurer and review both your roofing and solar warranty terms to ensure that work by multiple trades does not invalidate coverage.
- Grid connection: If you change the inverter or system size, your network provider, Evoenergy, may need to be notified or approve the changes.
Step Five: Coordinate the Trades and Build a Schedule
The most common source of problems is poor coordination. Ideally, one party takes responsibility for managing the schedule, or you appoint a roofer who regularly works alongside solar installers. A typical sequence looks like this:
- Pre-work inspection: The solar installer records system performance, photographs the array and wiring, and tests the system so that any pre-existing faults are documented.
- Safe shutdown and removal: A licensed electrician isolates the system, then panels, rails, cabling and inverter connections are carefully removed and stored off the roof, protected from damage.
- Roof strip and replacement: The roofer removes old materials, repairs any damaged battens or framing, installs sarking and insulation upgrades if planned, then lays the new roof covering.
- Mounting preparation: Brackets, flashings or attachment points are installed in the agreed positions, with all penetrations sealed.
- Solar reinstallation: The array is remounted, rewired, tested and recommissioned, and any inverter or battery upgrades are completed.
- Final inspection and handover: Both trades confirm the work, you receive updated documentation, and the system's generation is checked against pre-work performance.
Allow for weather delays. Canberra's winter frosts, wind and spring storms can interrupt roof work, and panels should never be handled on a wet, icy or windy roof.
Step Six: Plan for Downtime and Energy Costs
Your solar system will be offline from the day it is disconnected until it is recommissioned. For a straightforward roof, this may be several days to a couple of weeks, though larger or more complex projects can take longer. During this time you will draw all your power from the grid, so factor that into your budget. Scheduling the project in milder shoulder seasons, such as autumn or spring, can reduce both the heating and cooling load while your solar is down, and also offers more reliable working weather than mid-winter.
If you are on a feed-in tariff arrangement, ask your retailer whether a temporary system outage affects your plan. In most cases it will not, but it is worth confirming, particularly if you are considering a change in system size.
Step Seven: Budget Realistically
The cost of removing and reinstalling a solar system is separate from the cost of the roof itself, and varies with array size, roof access, roof type and whether cabling or mounting equipment needs replacing. Request itemised quotes from both the roofer and the https://troybjyn635.timeforchangecounselling.com/how-to-keep-birds-and-possums-out-of-your-roof-space solar installer and ask each to specify:
- The cost of panel removal, storage and reinstallation
- Replacement mounting hardware or rails, if needed
- Inverter replacement or upgrade options
- Any electrical compliance work or testing
- How damage to panels during handling will be dealt with and who carries liability
Obtaining at least three quotes helps you compare, but do not choose on price alone. A low quote that leaves out flashing, bracket replacement or electrical testing can cost far more later.
Common Mistakes to Avoid
Several errors regularly turn a manageable project into an expensive one. Avoid hiring a roofer who has no experience handling solar arrays, and avoid allowing general labourers to remove panels without electrician oversight, which is both unsafe and potentially unlawful. Do not skip photographic documentation before the job starts, since it protects you if there is a dispute about damage. Never reuse corroded or fatigued mounting hardware simply to save a small amount of money, and do not assume the old penetrations will line up neatly on the new roof. Finally, avoid replacing a roof and then adding more panels later through a separate project, as this means new penetrations in a brand-new roof and a second round of scaffolding and labour.
Questions to Ask Before You Sign
Before engaging contractors, ask each of them how many solar-related re-roofs they have completed, who will be on site, and whether they will work directly with your solar installer. Ask for proof of licensing and insurance, a written scope of work, a clear timetable and the warranty that applies to the finished roof and to any mounting work. A reputable provider will answer these questions openly and put the details in writing.
Plan Ahead for a Smoother Project
Replacing a roof beneath solar panels is a significant project, but it is also a chance to strengthen your home's protection, improve energy performance and prepare your property for the years beyond 2027. By assessing both systems early, choosing materials that suit your array, using licensed tradespeople and coordinating the schedule carefully, Canberra homeowners can protect their solar investment and avoid costly surprises. Start by arranging a roof inspection and a solar system check at the same time, and use the findings to build a single, well-planned project from start to finish.